摘要
通过对蒲洲发电分公司输煤系统堆取料方式的改造,实现了燃煤接卸与煤仓供煤两种运行方式同时进行,提高了火车来煤的接卸效率,有效地缓解了输煤系统的供求压力,增加了系统的可靠性。
Through the improvement in coal handling system's stacker mode,coal loading and unloading and coal bunker supply can be operated simultaneously.Consequently,train loading and unloading efficiency is improved.The supply for and demand of coal handling system is greatly balanced and the reliability of coal handling system is improved.
出处
《山西电力》
2011年第3期60-61,共2页
Shanxi Electric Power
关键词
输煤系统
堆取料改造
应用
coal handling system
improvement
application