同贝位同步装卸的集装箱码头装卸工艺与堆场平面布置 被引量:8

On synchronous loading and unloading technology within a bay and yard layout of container terminal
下载PDF
导出
摘要 为了适应集装箱船舶大型化的发展趋势,提高集装箱码头装卸效率,结合同贝位装卸作业的特点,提出进出口箱同贝位堆放的新型堆场堆放策略,设计同贝同步装卸的岸边及堆场装卸工艺。运用系统仿真技术,仿真研究堆场设备选型问题,为集装箱码头实施同贝同步装卸提供技术依据。 To adapt to the development of large-scale container ships,the wharf handling efficiency needs to be improved.Combining with the bay handling characteristics,a new yard stacking strategy is proposed,which is to stack the import and export boxes in the same yard-bay.The paper designs the shore and yard handling technology,which is loading and unloading the container in the same bay and at the same time.Using the system simulation technology,several simulation models are established,and the stockyards'equipment selection is researched.The paper can offer a technical support for the container terminal implementation of within-a-bay handling.
出处 《水运工程》 北大核心 2011年第6期66-69,共4页 Port & Waterway Engineering
基金 国家自然科学基金青年基金(60904067)
关键词 同贝同步装卸 集装箱 堆场布置 双悬臂轨道场桥 synchronous handling within a bay container yard layout double-cantilever crane
  • 相关文献

参考文献5

二级参考文献10

  • 1王嘉民,何琪敏,李晓鸣.边装边卸流程的系统开发[J].港口装卸,2006(3):1-4. 被引量:7
  • 2曾庆成,杨忠振.集装箱码头卸船作业调度方案的两阶段禁忌搜索算法[J].交通运输工程学报,2007,7(2):109-112. 被引量:12
  • 3GOODCHILD A V, DAGANZO C F. Double-cycling strategies for container ships and their effect on ship loading and unloading operations[J]. Transportation Science, 2006, 40(4): 473-483.
  • 4GOODCHILD A V, DAGANZO C F. Crane double cycling in container ports: planning methods and evaluation[J]. Trans portation Research Part B: Methodological, 2007, 41 (8) : 875-891.
  • 5BISH E K. A multiple-crane-constrained scheduling problem in a container terminal[J]. European Journal of Operational Research, 2003, 144(1): 83-107.
  • 6LEE D H, WANG H Q, MIAO L X. Quay crane scheduling with noninterference constraints in port container terminals[J]. Transportation Research Part E: Logistics and Transportation Review, 2008, 44(1): 124-135.
  • 7ZENG Qing cheng, YANG Zhong zhen. Integrating simulation and optimization to schedule loading operations in container terminals [J]. Computers and Operations Research 2009, 36(6): 1935-1944.
  • 8LAU H Y K, ZHAO Y. Integrated scheduling of handling equipment at automated container terminals[J]. International Journal of Production Economics, 2008, 112(2): 665 682.
  • 9ZHANG C Q, WAN Y W, LIU J Y, et al. Dynamic crane deployment in container storage yards [ J]. Transportation Research Part B: Methodological, 2002, 36(6): 537-555.
  • 10ZENG Qing-cheng, YANG Zhong-zhen, LAI Lu-yuan. Models and algorithms for muhi crane oriented scheduling method in container terminals [J]. Transport Policy, 2009, 16 ( 5): 271-278.

共引文献32

同被引文献50

引证文献8

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部