摘要
随着对高速铁路认识的不断加深,作为高速铁路供电系统的主体接触网工程技术不断完善。此文从高速铁路接触网工程特点入手,结合实际工作中编制高速铁路接触网工程概算所遇到的问题,提出解决方法,并就如何客观实际地编制接触网工程概算的有关问题进行探讨。
As the understanding of the high-speed railways deepens,the technique requirements of the catenary system of the high-speed railways are improving.Based on the characteristics of the catenary system of high-speed railways,this paper proposes the solutions to the problems in making the estimate of the catenary system of high-speed railways,and discusses the issues about how to make the estimate.
出处
《铁路工程造价管理》
2011年第3期33-37,共5页
Railway Engineering Cost Management
关键词
高速铁路
接触网
概算编制
high-speed railway
catenary system
estimate making