摘要 发电机组并网瞬间从系统大量抢无功功率,引发本侧母线电压和相邻并网其他机组间无功功率的大幅波动等现象。文中主要从理论和无功功率大幅波动现象进行分析,发现二滩水电站同期装置的电压差、励磁调差系数、机端初始电压等参数的定值整定不合理,从而提出对上述参数的一些整定策略。 In order to treat the abnormal voltage fluctuates at the bus bar of the plant,and large reactive power swings between the neighbor gird-connected units,which is caused by instantaneous period of gird connection of the unit.A theoretical analysis to the phenomenon is given.the reason of the improper setting parameter like voltage difference of the synchronization device,reactive compensation of excitation system,the terminal voltage of the unit are found out.And a modifying strategy based on these parameters is discussed.
出处 《水电自动化与大坝监测》 2011年第3期21-24,共4页 HYDROPOWER AUTOMATION AND DAM MONITORING
关键词 水电厂 水电机组 并网 无功功率 定值整定 hydropower plants hydraulic generators synchronizing power grid reactive power setting value
  • 相关文献

参考文献2

共引文献12

同被引文献36

引证文献4

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部