摘要
介绍了定量装车系统的组成, 对装车程序进行了分析并通过数据分析得出装车程序工艺参数的优化结果。
The structure of quantitative loading system was introduced. The loading program was analyged and the optimum result of the technological prarameters for the loading program was obtained with data analysis.
出处
《山西煤炭》
1999年第3期34-36,39,共4页
Shanxi Coal
关键词
定量装车系统
单位卸煤量
装车程序
工艺参数
quantitative loading system
unloading coal per unit of time
loading program.