摘要 采用低压铸造法浇注了壁厚为10mm与25mm的ZL114A平板件,通过测定其温度场研究了低压铸造条件下铸件的充型与凝固特点。结果表明,对于25mm平板件,凝固过程中板内从升液管口至铸件远端形成了较大的温度梯度,能够实现典型的顺序凝固,压力通过升液管可始终作用于凝固补缩过程;对于10mm平板件,其凝固速度较快,铸件整体倾向于同时凝固,补缩主要通过浇注系统在局部位置进行。对于10mm与25mm平板件,40mm/s的充型速度均能实现平稳充型与顺序充填。 ZL114A plate castings with 10 mm and 25 mm in thickness were produced by low pressure casting.Filling and solidification features of the low pressure casting plates were investigated by measuring temperature field.The results show that plate castings with 25 mm in thickness are subjected to sequential solidification with a large temperature gradient from riser tube to plate end.Pressure can be exerted on the whole feeding process during solidification through riser tube.For plate castings with 10 mm in thickness,whole plate castings tend to mushy solidification due to rapid solidification velocity,and the feeding is mainly conducted at local position.The filling rate of 40 mm/s can meet the requirements of smooth laminar molten flow for both 10 mm and 25 mm thick plate castings.
出处 《特种铸造及有色合金》 CAS CSCD 北大核心 2011年第5期436-438,389,共3页 Special Casting & Nonferrous Alloys
关键词 低压铸造 温度场 充型过程 凝固过程 Low Pressure Casting,Temperature Field,Filling Process,Solidification Process
  • 相关文献

参考文献3

二级参考文献11

共引文献36

同被引文献73

引证文献10

二级引证文献58

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部