摘要 岩爆是地下工程的一大地质灾害,目前还没有成熟的预报和治理方法。利用爆破手段释放高地应力来减少岩爆,一直是地下工程施工研究的重要课题。在锦屏二级水电站2#引水隧洞,进行了爆破释放应力试验,分别试验了掌子面倾斜辐射孔和围岩内倾斜辐射孔两种方案。试验结果证明了爆破是高应力释放的有效手段,通过合理的爆破设计与施工,可以达到控制或缓解岩爆的目的。 Rock burst is a big geological disaster for underground engineering without preferable forecasting and solving means at present.Releasing high crustal stress by blasting means to decrease rock burst is always an important task for underground engineering construction.In 2# diversion tunnel at Jinping two-stage Power Station,stress release-blasting experiments(declining radiating holes at working face and adjoining rocks) were carried out.The experimentation proved that blasting was an effective means for stress release,by reasonable blasting design and construction,the result of controlling or decreasing rock burst could be achieved.
出处 《工程爆破》 北大核心 2011年第2期8-11,共4页 Engineering Blasting
基金 中央级公益性科研院所基金项目(编号:CKSF2010019 单位代码:126202005)
关键词 引水隧洞 岩爆治理 应力释放爆破 Diversion tunnel Rock burst treatment Stress release-blasting
  • 相关文献

参考文献4

二级参考文献2

  • 1朱焕春.锦屏二级辅助洞岩爆控制现场工作总结报告[R].
  • 2[瑞典]E.B.斯蒂尔博格.用水胀式钢管锚杆防止岩爆[M].

共引文献5

同被引文献46

引证文献3

二级引证文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部