摘要
鉴于对后张梁孔道摩阻测试的必要性,文章介绍了后张梁孔道摩阻系数的试验原理和试验方法,通过采用线性回归原理,由规范中给出的公式推导预应力孔道摩组系数的计算公式,结合向莆铁路沙溪特大桥现场测试数据进行分析处理,计算出实际预应力孔道摩阻系数的值,并与设计值进行对比分析,对其影响因素作出总结。
In view of the necessity of post-tensioning beam pipe friction test,this paper describes the principles of post-tensioning beam pipe friction testing and test method,by using the principle of linear regression,and using standard formula to put out the calculative formula of prestressed pipeline hindering.In combination with the local test data of Xiangpu Railway Shaxi super major bridge,calculates the value of practical prestressed pipeline hindering modulus,compares with design value,and makes summaries on the affecting factors,which may provide reference for bridge engineering technicians.
出处
《高速铁路技术》
2011年第3期1-4,共4页
High Speed Railway Technology
关键词
后张梁
线性回归
摩阻试验
摩阻系数
有效预应力