期刊文献+

峡谷区尾矿库小流域洪峰流量计算方法探讨 被引量:3

Discussion on Flood Peak Flow Calculation Method of Small Westershed for Mine Tailing Pool of Gulch Area
下载PDF
导出
摘要 峡谷区地形条件复杂,汇水区多为山地地形,汇流速度快,因此峡谷区内尾矿库的选址与设计,首先要考虑其所在小流域洪峰流量的大小。探讨了目前普遍采用的流域洪峰流量计算方法后,选择了适合峡谷区小流域洪峰流量的计算公式,并以云南省某峡谷区尾矿库为例,进行了实地的计算。通过实际调查后,计算结果接近实际情况,计算方法值得在其他峡谷区推广应用。 Due to the complex terrain in gulch area,and mostly mountainous terrain in the area of water collection with fast collecting flow speed,it is essential to consider the volume of small watershed's flood peak flow in choosing and designing of tailing pool in gulch area.After studying the flood peak flow calculation method adopted generally at present,the calculation formula of small watershed's flood peak flow suiting to the gulch area is selected.Meanwhile,taking the mine tailing pool in a certain gulch area of Yunnan province for example,the field calculation on the flood peak flow is carried out.With the actual survey,the calculation result approaches the actual situation.This calculation method is worthy of popularizing in other gulch area.
出处 《金属矿山》 CAS 北大核心 2011年第6期143-145,共3页 Metal Mine
基金 国家自然科学基金项目(编号:40901294) 云南省教育厅科学基金项目(编号:09Y0045)
关键词 峡谷区 尾矿库选址 流域 洪峰流量 Gulch Area Address selection of mine tailing pool Watershed Flood peak flow
  • 相关文献

参考文献10

二级参考文献19

  • 1钱叶照,蒋祥阳,林启祥,李奎,吴红兵.大岭冲尾矿库选址研究[J].矿业快报,2006,22(8):51-52. 被引量:2
  • 2夏既胜,秦德先,杨树华,李运河.基于GIS的矿山尾矿库选址方法研究——以个旧锡矿某矿山为例[J].金属矿山,2006,35(8):51-54. 被引量:13
  • 3刘志标 李青 余天翔 等.广州市白云区石井河整治工程规划报告[R].广州:广州市白云区水利水电勘测设计室,2000..
  • 4.SL201-97.江河流域规划编制规范[S].,1997..
  • 5广东省水文局.广东省暴雨径流查算图表使用手册[Z].,1991..
  • 6广东省水文局.广东省水文图集[Z].,1991..
  • 7广东省水文局.推理公式法[Z].,1988..
  • 8.SLA4-93.水利水电工程设计洪水计算规范[S].,1993..
  • 9上海市建委.GBJ14-87,室外排水设计规范[S].北京:中国建筑工业出版社,1988..
  • 10水利部长江水利委员会.SL44-93,水利水电工程设计洪水计算规范[S].北京:中国水利电力出版社,1993..

共引文献25

同被引文献199

引证文献3

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部