摘要
结合上海上电漕泾发电有限公司1、2号机组热力系统化学清洗的实践,对新建大型塔式炉的化学清洗提出了建议。
Contrasted with the Chemical cleaning guide for steam power plant, according to the current chemical cleaning in No. 1, No. 2 thermodynamic system of the Shanghai Caojing Power Generation Plant, to put forward suggestions for the chemical cleaning to the newly -built large tower boiler.
出处
《清洗世界》
CAS
2011年第6期33-40,共8页
Cleaning World