摘要
针对验收监测中废水总量核定面临的问题,根据中小项目环保验收的实践,对于排污口是否安装在线监测设备、是否具备测流条件等不同情况,分别提出了验收监测中相应的废水总量核定技术,具有很好的可操作性。
In order to solve the problems in medium and small projects,such as whether the online monitoring equipments should be installed on the outlets of waste water and whether the condition for flow assay was obtained,the relative approval techniques on waste water volume has been proposed.The method has been tested to be operational with comparative reliability in practice.
出处
《环境监控与预警》
2011年第3期18-20,共3页
Environmental Monitoring and Forewarning
关键词
环保验收监测
总量核定
建设项目
environmental acceptance inspection
total volume approval
project