期刊文献+

HF抗冲耐磨混凝土在天花板水电站工程中的应用 被引量:3

Application of HF Abrasion-resistant Concrete in Tianhuaban Hydropower Station
下载PDF
导出
摘要 天花板水电站工程泄洪建筑物采用坝身布置表孔和泄洪中孔,流速高、含沙量较大的水流从坝体通过,对泄流面的混凝土提出了抗冲耐磨等要求。在总结抗冲耐磨混凝土科研和工程实践经验的基础上,提出了采用HF抗冲耐磨混凝土,并根据工程的混凝土原材料特性情况开展了抗冲耐磨混凝土配合比的试验研究。研究结果表明,HF抗冲耐磨混凝土方案合理、经济,可以满足工程要求。 The flood diseharge structure of Tianhuaban Hydropower Station is arranged in dam body with surface and middle outlets. The flood with higher veloeity and sediment eoneentration will flow through the dam body and the eonerete on the discharge structure surface need to be with higher abrasion resistanee. After summarizing the experienees in research and engineering praetiee, the HF abrasion-resistant eonerete was proposed to be used in the project, and the mix proportion of concrete was experimentally studied based on the engineering properties of eonerete raw materials. The results show that the application of HF abrasion-resistant eonerete is reasonable and economic, and can meet the engineering requirements.
出处 《水力发电》 北大核心 2011年第6期20-22,共3页 Water Power
关键词 HF混凝土 抗冲耐磨 配合比 天花板水电站 HF concrete abrasion resistanee mix proportion Tianhuaban Hydropower Station
  • 相关文献

参考文献3

  • 1支拴喜.高速含沙水流建筑物抗磨蚀混凝土护面技术研究及应用[D].西安:西安理工大学,2008.
  • 2李光伟,杨元慧.溪洛渡水电站抗冲耐磨混凝土性能试验研究[J].水电站设计,2004,20(3):92-97. 被引量:18
  • 3曾正宾,何金荣.洪家渡水电站抗冲耐磨混凝土试验报告[R].贵洲:中国水电顾问集团贵阳勘测设计研究院.2008.

共引文献17

同被引文献12

引证文献3

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部