摘要
根据江苏油田电网自身特点,围绕钻机实施网电拖动技术改造的具体要求,对钻机网电拖动方案进行探讨,形成了一套符合江苏油田电网实际,切实可行的并具有江苏油田特色的钻机网电改造方案。通过现场试验和使用,采用工业电网取代柴油发电机组或柴油机给绞车、转盘、泥浆泵及MCC等提供电力,不仅省钱、省油,节约钻井成本,还可减少现场的噪声、废气排放和油污污染,缓解工农矛盾,可实现节约、安全、清洁和高效生产。
Based on the characteristics of the power system of Jiangsu Oilfield and the specific requirements for implementation of the grid power drilling,the program of grid power drilling for Jiangsu Oil Field is practical,useful and specific.Through field testing and use,the diesel power generators and the main power diesel replaced by industry power,supply the electricity to winch,wheel,mud pump and other MCC,is proved not only to save money,increase fuel efficient,reduce the cost of drilling,and reduce noise,emissions and oil pollution,ease the contradiction between the workers and peasants.It will be a saving,safe,clean and efficient production way in the future.
出处
《石油矿场机械》
2011年第6期94-97,共4页
Oil Field Equipment
关键词
石油钻机
网电
改造
drilling rig
network power supply
upgrading