抢风岭隧道煤层地段施工控制技术 被引量:4

Construction Control Technology of Qiangfengling Tunnel in Coal Section
下载PDF
导出
摘要 抢风岭隧道施工长距离穿越煤层及小煤窑采空区,地质条件极差,常伴有涌水现象发生,施工难度大。针对工程情况,采取加强超前支护的措施,并根据实际围岩情况及时调整开挖方式和支护参数,提高初期支护的整体性,对涌水和采空区分别采取了特殊的处理措施。通过加强监控量测,及时对数据进行回归分析,掌握不同围岩情况下初支前期沉降规律,调整预留变形量,采取质量安全控制措施,保证了工程的顺利进行。 Qiangfengling tunnel crossing coal section and goal with poor geological conditions and gushing water in long distance is difficult to construct. Authors take measures of strengthening advance support and adjust excavation method and support parameters according to actual surrounding rock situation to improve integrity of primary support. Meanwhile, special measures are adopted in goaf and gushing water area. Based on monitoring, authors make regression analysis on data to master settlement law and adjust reserved deformation. Quality and safety measures are adopted to ensure the construction smooth.
出处 《施工技术》 CAS 北大核心 2011年第7期72-74,83,共4页 Construction Technology
关键词 松散软弱煤层 超前支护 支护参数 涌水 采空区 瓦斯检测 loose and weak coal seam advance support support parameters gushing water goaf methane detection
  • 相关文献

参考文献3

  • 1中交第一公路工程局有限公司.JTGF60--2009公路隧道施工技术规范[S].北京:人民交通出版社,2009.
  • 2矿井瓦斯抽放管理规范[S].北京:煤炭工业出版社,2009.
  • 3国有色金属工业协会.GB50026--2007工程测量规范[S].北京:中国计划出版社,2007.

共引文献6

同被引文献19

引证文献4

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部