介绍了铁口源水库溢洪道右岸滑坡体的特征及规模,分析了其形成的原因,论述了采用削坡减载处理,对坡面进行保护,并设置排水设施的治理设计方案。
An introduction was made on the features and size of landslide occurred on the spillway left bank of Tiekouyuan Reservoir. Based on analysis of the causes, the author presented the treatment design scheme, including cutting slope and unloading, protection of slope surface and drainage facilities.