摘要 介绍高120m塔桅式烟囱内筒体更换的技术难点、施工工艺原理及方法,采用这种方法进行施工,有效地解决了在烟囱断口以上部位设置吊装机具的难题,可使隐患彻底消除,同时避免了在高空拆除和安装保温层的施工作业,保证了工程质量、工期和安全。 This paper describes the technical Challenges in changing the inner barrel of a 120m high flare stack supported with tower mast, and method adopted in the changing operation. By taking this method, the difficulty in setting up hoisting tools above the break - up section of the flare stack was effectively overcome, eliminating completely potential dangers, while avoided the stripping and coating operation of thermal insulation layers high above the ground. The project qualify & term, and safety were well assured.
作者 焦达
出处 《石油工程建设》 1999年第6期34-35,39,共3页 Petroleum Engineering Construction
关键词 火炬 维修 安装 吊装 烟囱 筒体 炼油 Flare, Maintenance, Mounting, Measure