摘要
简述了株冶常压富氧直接浸出炼锌扩建工程的工艺流程,介绍了Profibus现场总线控制系统,叙述了株冶现场总线系统的网络结构、总线布置及设计中存在的问题。
The process flowsheet of expansion project of atmospheric enriched-oxygen direct leaching for zinc smelting in Zhuzhou Smelter was briefly represented,the probibus field bus control system was introduced,and the network structure,bus configuration of field bus system of Zhuzhou Smelter and problems existing in design were described.
出处
《中国有色冶金》
北大核心
2011年第3期8-13,共6页
China Nonferrous Metallurgy