摘要
介绍了常压富氧直接浸出炼锌工程DL浸出车间结构设计中的主要技术内容,对钢筋混凝土平腹杆双肢柱在工程中的应用及其计算方法进行了探讨。
The main technical contents about structural design of DL leaching shop in the project of atmospheric oxygen-enriched direct leaching of zinc smelting in Zhuzhou Smelter were introduced,the application of reinforced concrete battened column with horizontal web member in the project and its calculating method were discussed.
出处
《中国有色冶金》
北大核心
2011年第3期14-16,共3页
China Nonferrous Metallurgy
关键词
平腹杆双肢柱
刚度折减系数
内力计算
偏心距增大系数
battened column with horizontal web member
rigidity reduction factor
internal force calculation
increasing coefficient of eccentricity