摘要
可控震源施工中使用交替扫描的方法可以大大提高生产效率。本文从设备的硬件连接、系统联机和具体的参数设置着手,详尽地介绍了428XL仪器配合先进Ⅲ电控箱体在施工中如何做到不用仿真VE432实现交替扫描的方法。
The adoption of flip-flop sweep can greatly improve production efficiency for vibroseis operation. From the hardware setting and system online as well as specific parameters setting, this paper described in detail on how to online with Advanced Ⅲ box for 428XL and how to operate flip-flop sweep instead of simulation as VE432.
出处
《物探装备》
2011年第3期161-164,共4页
Equipment for Geophysical Prospecting