摘要
以吉化公司龙潭山净水场综合净化间沉管灌注桩的施工实践为例,阐述了沉管灌注桩 的施工技术,并对施工中出现的一些质量问题,加以分析、研究,提出了相应的治理办法。
This paper explains the construction technology of subsiding pipe pouring stake by the example of construc- tion of purification workshop of Longtan Mountain Water Treatment plant of Jilin Chemical Industry Company.Prob- lems of project quality occurryed during construction are analyzed and studied as well as solution methods are given.
出处
《东北电力学院学报》
1999年第4期66-69,共4页
Journal of Northeast China Institute of Electric Power Engineering
关键词
沉管灌注桩
施工
振动
subsiding pipe
pouring
shaking