摘要
通过对电除尘器的11个重要安装环节的控制,保证了电除尘器工艺质量和除尘效率,使3台电除尘器空载升压获得一次成功。经满负荷检验,运行状态良好,达到了额定出力要求。
Through the control of 11 installation proce-dures of the electric dust collector of 500 MW unit, thetechnology quality and efficiency of the electric dust col-lector are guaranteed so that voltage - ralsing of emptyload of 3 dust collectors turned out to be a success. And aed operation under the full load condition and require-ments of rated output are also satisfied.