摘要
超超临界机组锅炉发生爆管不但使机组试运时间拖延,而且严重地危及设备安全和影响电厂的经济运行。文章分析了锅炉爆管的原因,并探讨了相应对策。
The tube burst occurring in supercritical unit,boiler not only delays the running schedule but also seriously jeopardizes the safety of equipment and effects the economic operation of the power plant.The paper analysed the cause of boiler tube burst and discussed correspondent countermeasures.
出处
《湖北电力》
2011年第3期27-28,共2页
Hubei Electric Power
关键词
爆管危害
原因分析
对策探讨
harm from of tube burst
cause analysis
countermeasures