摘要
结合凯悦国际大厦超高层工程实例,通过研究玻璃幕墙与主体结构的施工技术,加强施工测量的控制和变形的监测,优化玻璃幕墙与主体结构之间的连接节点,合理划分施工区段,有效组织流水作业,使玻璃幕墙与主体结构的施工有条不紊地穿插进行,体现出超高层建筑的施工特点,解决安装玻璃幕墙对超高层工程的工期制约,整体建筑效果美观.
Combined with the construction practice of the super high-rise of Campland International Masion and through the study of the construction technology of the glass curtain wall and the main structure,this paper strengthened the survey control and deformation monitoring,optimized the connected joints of the glass curtain wall and the main structure,divided up the construction sections rationally and organized the construction flow processes effectively.All this enabled the construction of the main structure interspersed with the glass curtain wall to be in a good order and reflected the construction characteristics of the super high-rise building,which solved the schedule constraints of the installation of the glass curtain wall on the super high-rise building and made the overall architectural renderings beautiful.
出处
《青岛理工大学学报》
CAS
2011年第3期126-130,共5页
Journal of Qingdao University of Technology
关键词
玻璃幕墙
主体结构
穿插施工
测量控制
glass curtain wall
main structure
interspersed construction
survey control