长输管道建设管理创新的实践与探索——以川气东送川东北—川西输气联络线中段工程为例 被引量:1

Practice and Exploration of Management Innovation on Long Distance Pipeline Construction
下载PDF
导出
摘要 针对长输管道建设施工管理存在的主要问题,在川气东送川东北-川西输气联络线中段工程进行了施工管理创新的实践与探索,形成了青苗赔偿协调"乙方负责法"、投资控制"风险包断法"与"工程量变更签证图纸对比法"、分包管理"相关工程捆绑法"、质量安全"特别禁令法"等创新性管理办法,取得了施工进度领先、管理费用大幅降低的良好效果。 In view of main problems existing in long distance pipeline construction management,based on case study of middle section project construction of Northeast Sichuan-Western Sichuan connecting line which is one part of the Sichuan-East Gas Transmission Pipeline Project,some creative methods on construction management are put forward and applied.These innovative methods include as follows:(1) Part B liability method on crop compensation coordination;(2) risk contracting method and design drawings comparison method used for quantities change visa on investment control management;(3) related projects bundling method on sub-contract management;(4) special prohibition method on quality security management.
作者 罗成忠
出处 《天然气技术与经济》 2011年第3期68-70,75,共4页 Natural Gas Technology and Economy
关键词 长输管道 川气东送 管理创新 long distance pipeline Sichuan-East Gas Transmission Pipeline Project management innovation
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部