摘要 针对新兴煤矿41051工作面发生的冲击地压事故,通过分析新兴煤矿的地质条件,确定了新兴煤矿发生冲击地压的影响因素。同时针对该矿采用的沿空巷道留设煤柱的特殊采煤方式,运用FLAC3D软件进行数值模拟,对工作面附近区域的煤体应力分布进行了分析,发现由于煤柱的留设,使得工作面上部区域的应力集中程度较高,为冲击地压发生的危险区域。通过模拟和分析地质因素及采煤方式,提出了针对该工作面的有效解决方案。 According to the mine pressure bumping accident occurred in No.41051 coal mining face of Xinxing Mine,with the analysis on the geological conditions of the Xinxing Mine,the influence factors of the mine pressure bumping occurred in the Xinxing Mine were set up.Meanwhile,according to the special mining method with the coal pillar left in the gateway retained along the goaf in the mine,the FLAC3D software was applied to the numerical simulation.An analysis was conducted on the seam stress distribution in the area near the coal mining face.Due to the coal pillars left,the stress concentration degree in the upward area of the coal mining face would be high and the upward area would be a danger area to occur the mine pressure bumping.With the simulation and analysis on the geological factors and coal mining methods,an effective solution to the coal mining face was proposed.
出处 《煤炭工程》 北大核心 2011年第7期64-66,共3页 Coal Engineering
基金 国家重点基础研究发展计划(973)项目(2010CB226806)
关键词 冲击地压 影响因素 数值模拟 煤柱 新兴煤矿 mine pressure bumping influence factors numerical simulation coal pillar Xinxing Mine
  • 相关文献

参考文献4

二级参考文献21

共引文献546

同被引文献40

引证文献5

二级引证文献28

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部