结合312国道无锡段扩建工程W-5标钢板桩的施工实践,探讨了钢板桩围堰施工技术,介绍了围堰相关参数取值,着重阐述了钢板桩围堰施工顺序,操作要点及质量控制措施,为今后同类项目施工积累了一定经验。
Combining with the construction practice in W-5 steel-sheet pile in enlarging project along 312 national road in Wuxi, the paper, explores the construction technique of steel-sheet pile cofferdam, introduces the relative parameter value in cofferdam, illustrates the construction order and operation points and quality control measures for the steel-sheet pile cofferdam, so as to accumulate certain experience for future similar constructions.
出处
《山西建筑》
2011年第21期49-50,共2页
Shanxi Architecture
关键词
钢板桩
围堰
荷载
施工控制
steel-sheet pile, cofferdam, loading, construction control