以上海市某具体工程为例,阐述了超长地下室的无缝设计和一些防止裂缝的施工措施,包括设置后浇带,配筋控制,添加抗裂纤维等,从而较好地解决了主体,裙房及地下室采用桩筏时的不均匀沉降及大体积混凝土的裂缝问题。
Taking some project in Shanghai as the example, the paper illustrates the seamless deign of super-long basement and some construc- tion measures to prevent cracks, including the allocation of the post-casting band, the reinforcement control, and addition of polypropylene fiber, so as to solve the uneven settlement and large concrete cracks on the main body, the podium and basement which adopt the pile-raft.
出处
《山西建筑》
2011年第21期75-76,共2页
Shanxi Architecture
关键词
超长地下室
无缝设计
裂缝
后浇带
super-long basement, seamless design, crack, post-casting band