郑州东站站房主体结构设计 被引量:12

Design of the main building in East Zhengzhou Railway Station
原文传递
导出
摘要 郑州东站为全高架桥建合一的铁路枢纽站房,建筑面积为40万m2,主站房最大平面尺寸为239.8m×490.7m,为地上3层(局部4层)大跨度、大平面框架结构。站台层桥梁首次采用"钢骨混凝土柱+双向预应力混凝土箱形框架梁"结构,提高了出站层的建筑净空和使用面积,结构具有较好的抗震性能且施工方便。高架候车层采用"钢管混凝土柱+大跨度钢桁架+钢次梁"结构,减轻了楼盖结构自重,有利于在结构高度范围内布置设备,柱顶设置滑动支座的分缝方式简单易行,有效地降低了结构的温度作用,改善了结构抗震性能。在东、西立面将高为15.5m的斜面幕墙三向网格支承结构与屋盖及商业夹层楼盖钢结构相连形成倾斜的跨层钢桁架,解决了78m跨的高架层夹层楼盖的竖向舒适度问题。屋盖采用折梁式空间管桁架结构,结合建筑造型,在屋盖结构的柱顶设置四角锥斜钢管柱以减小屋盖跨度,降低屋盖用钢量,屋盖结构选型与建筑的形态吻合。理论分析和结构试验表明,郑州东站结构体系传力明确,结构安全、可靠,同时具有良好的经济性和使用性能。 As the railway junction without basement,the East Zhengzhou Railway Station is 400 000m2 in construction area with 239.8m×490.7m in plan dimension.The main building is a 3-storey frame(partly 4-storey)with large span and dimension.SRC columns and PRC box frame beams are used for the railway bridge structure on the 2nd floor,and the adopted structure not only increases the net storey height and net passengers' exit area on the 1st floor,but also has good seismic performance and is easy for construction.The structure for waiting hall on the 3rd floor consists of CFST column,large span steel truss and steel girder,which has lightened the selfweight and is easy for the installment of the mechanical and electrical equipments in truss.The aseismic joint on floor is located at column axises,and the floor structure at aseismic joint is supported by the bearings on the top of CFST columns.The aseismic joints are advantageous to the reduction of temperature-induced internal forces in the structure and the increase of the seismic performance.The oblique three-dimensional latticed structure,which supports the glass curtain wall of 15.5m in height on east and west side of the main building,forms truss with storey height by connecting to steel trusses both on the roof and the 4th floor.The truss with storey height structure solves the human comfort problem on the 4th floor with the span of 78m induced by human activities.The spatial steel pipe truss of vertical folding type is adopted in the roof structure,four spatially pyramidic deployed steel pipes on the top of each CFST column are used to support the steel roof structure,reduce the roof span and meet with requirements of architecture.Detailed analysis and tests indicate that the whole structure is safe,economical and has good serviceability.
出处 《建筑结构》 CSCD 北大核心 2011年第7期50-58,101,共10页 Building Structure
关键词 桥建合一 预应力混凝土箱形框架梁 钢骨(钢管)柱 (跨层)钢桁架 三向网格结构 复杂相贯节点 楼盖舒适度 bridge-station combined structure PRC box beams SRC(CFST) columns steel truss with storey height three-dimensional latticed structure complicated unstiffened steel pipe joints human comfort
  • 相关文献

参考文献8

  • 1GB50153--2008工程结构可靠性设计统一标准[S].北京:中国建筑工业出版社,2009.
  • 2铁建设[2007]47号新建时速300-350公里客运专线铁路设计暂行规定[S].北京:中国铁道出版社,2008.
  • 3TBl0002.1-2005铁路桥涵设计基本规范[S].北京:中国铁道出版社,2008.
  • 4李功标,周德良,谭赟,敖晓钦,李霆,许敏.郑州东站主站房屋盖结构设计与分析[J].建筑结构,2011,41(7):64-68. 被引量:1
  • 5Eurocode3 : Design of steel structures Part 1.8 : Design of joints[ S]. 2002.
  • 6GB50111-2006.铁路工程抗震设计规范[S].北京:中国计划出版社,2006
  • 7GB50011-2010建筑抗震设计规范[S].北京:中国建筑工业出版社,2010.
  • 8JGJl40--2004预应力混凝土结构抗震设计规程[S].北京:中国建筑工业出版社,2004.

二级参考文献7

共引文献976

同被引文献61

引证文献12

二级引证文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部