期刊文献+

锅炉煤粉仓给粉电动机跳闸原因分析及处理措施

Cause Analysis and Treatment Measures on Tripping off of Boiler Coal Powder Provided Motor
下载PDF
导出
摘要 介绍锅炉煤粉仓12台给粉电动机全部跳闸的故障情况,通过对DCS追忆分析和双回路电源互投模拟试验验证,认为给粉电动机供电回路接触器跳闸时间滞后于备用电源自投时间是导致给粉电动机全部跳闸的原因,并提出改造给粉电源控制回路、更换给粉电动机控制接触器的措施。 For the phenomenon of 12 motors of the coal powder provided motor tripping off,this paper considers that the reason of the coal powder provided motor tripping off is the time of power supply circuit touch implement failure is shorter than the time of alternate power source work,through analyzing the remembrance of DCS and test validating of double-circait power launching each other,and propose measures of altering the coal power provided power supply circuit and replacing the touch implement of coal powder provided motor.
出处 《河北电力技术》 2011年第3期24-25,共2页 Hebei Electric Power
关键词 锅炉 煤粉仓 给粉电动机 跳闸 boiler coal powder storage coal powder motor tripping off
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部