摘要
介绍了液压滑模施工技术在瓦屋山水电站竖井施工中的应用。液压滑模施工具有施工速度快、施工工艺可靠、经济效益明显等特点。结合工程实践,对液压滑模系统结构设计和施工方法进行了阐述。
At Wawushan hydropower station,its surge tank is a circular vertical shaft with diameter 20.0m and depth 107.2m.The most surrounding rocks are classified as IV and V,therefore,the surrounding rocks are fractured,resulting in great construction difficulties.During construction,proper safety support measures should be taken to ensure safety during shaft excavation and to ensure commercial operation of Wawushan hydropower station on time and gain benefits.In this paper,safety support measures for surge shaft with large section are selected among conventional underground engineering support measures and safety support scheme during large-sized surge chamber excavation under poor and weak rock geological conditions are presented to give references to the similar projects.
出处
《四川水力发电》
2011年第3期64-68,176,共5页
Sichuan Hydropower
关键词
瓦屋山水电站
调压室工程
竖井衬砌
液压滑模
设计
安装
施工
滑模拆除
Wawushan hydropower station
surge chamber project
weak rock
shaft excavation
safety support
construction monitoring