摘要
文章根据积石峡水电站330 kV送出工程在电站出线侧的复杂地形和施工环境,分析了施工存在的问题,有针对性提出了解决处理方案,并通过实践检验了方案的可行性,保证了工程安全可靠完工。
According to complicated landform and construction condition of 330kV delivery engineering of Jishixia hydropower station,the paper analyzes existing problems,and proposes relevant solving scheme,as well as inspects scheme feasibility through practice,thus reliably ensures engineering completion.
出处
《青海电力》
2011年第2期60-63,共4页
Qinghai Electric Power
关键词
张力架线
上扬
转向
方案
tension stringing
boost
diversion
scheme