粮库机电设备安装调试策略

The Strategies of MEC Equipment Installation and Trial Run for Grain Depot
下载PDF
导出
摘要 粮库机电设备安装完成后首先要进行单机调试。以检查系统设备的设计、制造和安装调试的质量,能否满足生产运行的需要。在实际工作中往往会碰到意想不到的异常现象,使电机起动失败而跳闸。本文着重介绍了电机故障原因、启动失败故障分析及对策,为了减少电机启动运行故障,在启动前和试运行过程中应检查的项目和进行的事前准备工作。 Single machine trial run shall be carried out after the installation of MEC equipment is finished,so as to check whether the design,manufacture and installation can meet the requirement of production.In practical works,there is always some unexpected anomalies that cause the motor start failure and tripping.Thus,the reasons of motor breakdown are mainly introduced here and the analysis,countermeasures,items to be checked before and during the trial run are given.
作者 杨松山
出处 《粮食流通技术》 2011年第3期29-32,共4页 Grain Distribution Technology
关键词 机电设备安装 调试 试运转 启动失败 原因分析 对策 installation of MEC equipment commissioning trial run start failure reason analysis countermeasure
  • 相关文献

参考文献4

  • 1《电气装置安装工程电缆线路施工及验收规池》GB50168—2006[S].
  • 2《电气装置安装工程旋转电机施及验收规范》GB50170—2006[S].
  • 3《电气装置发装工程低斥电器施及验收脱池》GB50254—96[S].
  • 4《粮食仓库机电设备安装技术规程》LSl207—2005[S].

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部