期刊文献+

矿区地面场景三维建模与可视化研究 被引量:1

Research on 3D Modeling and Visualization of Ground Scene of the Mining Area
下载PDF
导出
摘要 文章根据矿区的地面环境特征和实体类型,将矿区地面实体分成点、线、面、体四个部分,以ArcEngine为开发平台、Multipath为三维数据模型,动态建立矿区地面三维场景。云南东川某矿的地面场景的三维建模结果表明,该方法具有较高的精度和逼真性。 According to the characteristics of the ground environment and the types of the entities in the mining area,the object of the minging ground were divided into four parts which include point,line,surface and body models.Then,the three-dimensional scene of the mining area was built dynamically using ArcEngine as the development platform and Multipath as the three-dimensional data model.The results of YunnanDongchuan three-dimensional scene modeling show that this method has high accuracy and realism.
出处 《大众科技》 2011年第7期122-124,共3页 Popular Science & Technology
关键词 矿区地面场景 三维建模 可视化 GIS技术 ground scene of the mining area three-dimensional model visualization GIS technology
  • 相关文献

参考文献7

二级参考文献30

  • 1岳金柱,冯仲科.森林火灾扑救风险管理问题的探讨与研究[J].中国安全科学学报,2006,16(2):120-125. 被引量:13
  • 2刘洪江,唐川,韩用顺.基于WebGIS的城市泥石流数字减灾系统建立及其应用[J].灾害学,2006,21(3):10-14. 被引量:9
  • 3汪云甲,伏永明.矿井巷道三维自动建模方法研究[J].武汉大学学报(信息科学版),2006,31(12):1097-1100. 被引量:62
  • 4中国电信集团公司.中国电信本地网网络资源管理系统功能技术规范[Z].中国电信集团公司,2001.
  • 5Smith K. Environmental Hazards: Assessing Risk and Reducing Disaster[M]. London: Routledge, 1996
  • 6William J P,ArthurA A E[美].自然灾害风险评价和减灾政策[M].向立云等译.北京:地震出版社,1993
  • 7R. Hollingsworth, G. S. Kovacs. Soil slumps and debris flows: prediction and protection[J].Bulletin of the Association of Engineering Geologists, 1981, 38 (1) : 17 - 28
  • 8С.М.Флейпман弗莱施曼[苏].泥石流[M].姚德基译.北京:科学出版社,1986
  • 9姚德基,商向朝.国外泥石流研究中若干基本理论问题[A].泥石流论文集[C].重庆:科学技术文献出版社重庆分社,1986:142-145
  • 10N. M. blejia, E. E. Wohl, S. D. Oaks. Geological hazards, vulnerability and risk assessment using GIS model for Glenwood Springs, Colorado[J]. Geomorphology, 1994,10:331 - 354

共引文献42

同被引文献8

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部