重型机械加工车间物流协调调度问题研究 被引量:6

Study on logistics facilities coordination scheduling problem of heavy-duty mechanical workshop
下载PDF
导出
摘要 重型机械加工车间中大型物料搬运占用时间长,制定调度方案不能单纯考虑生产设备,生产设备和物流设备安排不合理,容易出现停工等待.为解决重型机械加工车间多种物流设备和生产设备协调调度问题,分析了该类车间物流和生产特点,提出运用带有阻塞属性的混合流水车间调度问题的建模方法,构建该类车间物流协调调度问题的数学模型,并运用遗传算法对数学模型进行求解.最后针对某电信通信塔制造厂实例,运用该方法,结果得到车间天车、车辆以及生产设备的物流协调调度方案,使得该方案的所有工件最大完成时间较原方案小,并通过离散时间动态仿真方法验证了所建立数学模型以及求解方法有效. It takes a long time to move huge parts in the heavy-duty mechanical department and the schedule only considering production facilities is not adequate.Therefore,the hybrid flow shop problem with blocking(HFS-B)is introduced to analyze the various logistics and production facilities coordination scheduling problem in the heavy-duty mechanical department.A mathematical model of the problem is built up and optimization process of scheduling problem is carried out based on genetic algorithm.A project example is presented and its optimization scheme is obtained for the logistics and facilities coordination scheduling problem,concerning cranes,vehicles and manufacturing facilities.Finally,it is concluded from the simulation results that the method is effective.
作者 陈超 鲁建厦
出处 《浙江工业大学学报》 CAS 北大核心 2011年第4期452-457,共6页 Journal of Zhejiang University of Technology
基金 国家自然科学基金资助项目(70971118) 浙江省科技厅计划项目(2009C31025 2009C11164)
关键词 协调 物流调度 混合流水车间 仿真 coordination logistics schedule hybrid flow shop simulation
  • 相关文献

参考文献2

二级参考文献12

  • 1侍慕超.90年代初国内外锻压机械的发展概况(2)[J].锻压机械,1996,31(2):3-6. 被引量:2
  • 2Sawik T J. A scheduling algorithm for flexible flow lines with limited intermediate buffers[J]. Applied Stochastic Models and Data Analysis, 1993, 9:127-138.
  • 3Nowicki E. The permutation flow shop with buffers:A tabu search approach[J]. European Journal of Operational Research, 1999, 116: 205-219.
  • 4Pinedo M. Scheduling theory, algorithms, and systems[M]. 2nd ed. New Jersey: Prentice Hall, 2002.
  • 5Vigo D, Toth P. The vehicle routing problem[M].Philadelphia: Monographs on Discrete Mathematics and Applications, SIAM, 2002.
  • 6Glover F. Tabu search. Part Ⅰ[J]. ORSA Journal of Computing, 1989, 1(3):190-206.
  • 7Glover F. Tabu search. Part Ⅱ[J]. ORSA Journal of Computing, 1990, 2(1): 4-32.
  • 8Santos D L, Hunsucker J L, Deal D E. Global lower bounds for flow shops with multiple processors[J].European Journal of Operational Research, 1995, 80:112-120.
  • 9Raviraju K.Addressing design and control issues of AGV-based FMSs with Petri net aided simulation [J].Computer Integrated Manufacturing System, 1993, 6(2): 123-134.
  • 10Goyal S K,Mehta Kapil.Simulation for analysis of scheduling rules for a flexible manufacturing system [J]. Integrated Manufacturing Systems, 1995, 6(5): 21-26.

共引文献13

同被引文献66

引证文献6

二级引证文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部