列控系统室内集成测试流程及方法的探讨 被引量:1

Discussion on Procedures and Methods of Laboratory Integration Test of Train Control System
下载PDF
导出
摘要 结合客运专线列控系统的科研开发和工程应用,以武广客运专线为例,对列控系统室内集成测试的流程、内容及方法进行探讨,通过C2/C3测试内容和方法的比照,提出了CTCS-3车地一体的SDT测试的优越性,SDT测试将会覆盖列控系统功能及全部工程配置数据。SDT测试已成功运用于武广工程,并证实了其有效性。 Taking Wu-Guang DPL as an example, this paper discusses the procedures, contents and methods of laboratory integration test of train control system based on the development and application of train control systems for DPLs. It presents the advantages of the system delivery test (SDT) of the whole CTCS-3 train-wayside system by comparison of the contents and methods for CTCS-2/CTCS-3 test. The SDT covers the test of train control system functions and all engineering confi guration data. It has been successfully applied to Wu-Guang Project, and its effectiveness has been verifi ed.
作者 刘长波
出处 《铁路通信信号工程技术》 2011年第3期9-14,共6页 Railway Signalling & Communication Engineering
关键词 列控系统 集成测试 流程 方法 武广客运专线 train control system integration test procedure methods Wu-Guang DPL
  • 相关文献

参考文献5

  • 1谭征.软件工程与管理[M].北京:清华大学出版社,2005.
  • 2科技运函[2008]34号CTCS-5级列控系统总体技术方案[S].
  • 3铁道部科技运[2008]151号客运专线列控系统临时限速技术规范(V1.0)[S].
  • 4科技运[2008]144号CTCS-5级列控系统应答器应用原则(Vl.0)[S].
  • 5傅世善.铁路信号基础知识 第八讲 列控系统的应用等级[J].铁路通信信号工程技术,2010,7(6):78-79. 被引量:4

共引文献4

同被引文献6

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部