郑西高铁ZPW-2000A无绝缘轨道电路调试与开通试验方法 被引量:3

Commissioning and Testing Methods of ZPW-2000A Jointless Track Circuits for Zheng-Xi High-speed railway
下载PDF
导出
摘要 研究高速铁路ZPW-2000A无绝缘轨道电路的调试与开通试验方法的主要目的是为了高速铁路建设项目信号施工现场调试的标准化、规范化,同时也是为了保证试验的完整性和安全性。采用具体举例的方法进行说明,简明易懂,便于现场人员理解、掌握。通过现场实践,应用取得良好效果,值得在新建高速铁路上推广。 The purpose in studying commissioning and testing methods of ZPW-2000A jointless track circuits for high-speed railways is to standardize signal on-site commissioning in high-speed construction projects and to guarantee the integrity and safety of the test. The article illustrates the methods with particular examples for easy understand by personal on site. Through the practice on site, the methods have good effect in the application and they are worthy for use in construction of new high-speed railways.
作者 贾正规
出处 《铁路通信信号工程技术》 2011年第3期69-72,共4页 Railway Signalling & Communication Engineering
关键词 高速铁路 ZPW-2000A 调试 标准化 规范化 high-speed railway ZPW-2000A jointless track circuit commissioning standardization normalization
  • 相关文献

参考文献3

共引文献8

同被引文献5

引证文献3

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部