摘要 呼和浩特抽水蓄能电站拦沙坝建基面开挖采用预裂控制爆破技术,通过搭设钻机作业的钢管架,采用间隔不耦合装药结构,严格控制钻孔方向、倾角和单孔装药量,避免了建基面出现欠挖和超挖量过大现象,预裂缝的形成降低了爆破震动影响,基岩无爆破裂隙出现,开挖质量优良。 The excavation of dam-foundation interface for the river dam in Hohhot Pumped-storage Power Station is conducted by using presplit blasting technology. By erecting steel frames for holes drilling, adopting uncoupling charging structure with interval and strictly controlling drilling direction and inclination and unit charge volume, the excessive overand under-excavations are avoided. The pre-craeks also reduce the impact of blasting on bedrock and there is on crack in bedrock caused by blasting. The practice shows that the excavation quality is excellent.
出处 《水力发电》 北大核心 2011年第7期42-43,共2页 Water Power
关键词 建基面开挖 预裂爆破 呼和浩特抽水蓄能电站 dam-foundation interface excavation presplit blasting Hohhot Pumped-storage Power Station
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部