摘要
介绍景洪电站升船机钢丝绳的安装及安装过程中出现的一些问题和解决方案,为以后水电站起重设备中钢丝绳的安装提供经验。
The paper presents the installation of ship lift wire rope as well as some problems and solutions during the installation in Jinghong power station,providing experience for the installation of wire rope for hydro-power station lifting equipment.