基于遗传算法的建筑工程三大目标综合优化 被引量:2

COMPREHENSIVE OPTIMIZATION FOR THREE MAIN OBJECTIVES IN CONSTRUCTION BASED ON GA
下载PDF
导出
摘要 工期、成本和质量是建筑工程的三大主要目标,他们能否顺利实现将直接影响项目总体目标的好坏,而以往提出的模型大都是侧重于对工期-成本两目标的综合优化,很少涉及质量目标,这显然是满足不了现实要求的。因此在这里提出了一个对三大目标综合优化的模型,它是在工期-成本、工期-质量为线性关系的基础上建立的,并且以综合目标函数作为适应度函数建立的依据,运用遗传算法进行求解。最后用一个实例验证了此模型的可行性,并且运算之后可以得到多组解,决策者可以根据自己的偏好选择自己满意的一组解。 Duration, cost and quality is the three main objectives of the construction. The performance of these three objectives can directly affect the entire target of the project . The best solution for a project is to achieve high quality with low cost in a proper time limit. But the previous model which could only resolve the time-cost trade-off problems that cannot satisfy decision makers' requirement. The objective of this paper is to present the development of an advanced multi-objective optimization model that supports minimizing construction time and cost,while maximizing its quality. The model is established on the base of the relationship of time-cost/time-quality is linear relationship, and is resolved by Genetic algorithm. An application example is analyzed to illustrate the use of the model and demonstrate its capabilities in generating and visualizing optimal tradeoffs among construction time, cost and quality,and it can give multiple solutions with each running. Decision makers can choose a solution according to their preferences.
出处 《建筑技术开发》 2011年第7期68-71,共4页 Building Technology Development
关键词 综合优化 模式 遗传算法 质量 comprehensive optimization Schema GA Quality
  • 相关文献

参考文献9

二级参考文献32

  • 1玄光男 程润伟.遗传算法与工程设计[M].北京:科学出版社,2000..
  • 2建筑施工手册编写组.建筑施工手册[S].北京,2000.7.
  • 3[5]Srinivas N,Deb K.Multiobjective optimization using non-dominated sorting in genetic algorithms[J].Evolutionary Computaion,1995(2):221-248.
  • 4[6]Deb K,Pratap A,Argrawal S,et al.A fast and elitist multi-objective genetic algorithm:NSGA II[J].IEEE Trans Evolutionary Computation,2002,6(2):182-197.
  • 5[7]Deb K.An efficient constraint handling method for genetic algorithm[J].Computer Methods in Applied Mechanics and Engineering,2000(186):311-338.
  • 6[9]Holtrop J,Mennen G J.An approximate power prediction method[J].International Shipbuilding Progress,1982,29(335):166-170.
  • 7Mckim R,Hegazy T,Attalla M.Project performance control in construction projects[J].Journal of Construction Engineering and Management,2000,126(2):137-141.
  • 8Do Ba Khang,Yin Mon Myint.Time,cost and quality trade-off in project management:A case study[J].International Journal of Project Management,1999,17(4):249-256.
  • 9Babu A J G,Suresh N.Project management with time,cost and quality considerations[ J ].European Journal of Operational Research,1996,88(2):320-327.
  • 10Liem Tran,Lucien Duckstein.Comparison of fuzzy numbers using a fuzzy distance measure[ J ].Fuzzy Sets and Systems,2002,130:331-341.

共引文献239

同被引文献20

引证文献2

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部