摘要
通过对大型构筑物基础模拟切割试验,试验模拟单元浇注、金刚石水平钻孔、金刚石绳锯切割、锯口内填充材料的灌注及剥离面的生成等,证明了对该建筑物基础横断面进行钻孔、分单元切割的技术完全可以达到项目对钻、切施工的技术要求。
To make a simulation experiment in large – scale buildings and structures translational cutting,including simulation unit casting,the level drilling of diamond,diamond wire saw cutting,poring into filling material within the saw bite and generation of dissection surface.It is proved to drill cross-section of the building foundation hole,modular cutting technology can achieve project drilling,cutting construction of technical requirements.
出处
《吉林地质》
2011年第2期137-142,146,共7页
Jilin Geology
关键词
切割试验
单元浇注
切割
大型构筑物基础
cutting test
unit casting
cutting
large building and structures base