期刊文献+

都江堰渠首工程系统分析(上)——概述历史典藉与定性论述

SYSTEM ANALYSIS OF THE DUJIANGYAN HEADWORK ENGINEERING 1. General Description, Classical Records and Qualittive Discussion
下载PDF
导出
摘要 本文以系统科学的一般理论原则为出发点、依据都江堰工程的历史经验与实测资料,对其渠首工程作了系统分析,揭示其'经久不衰'的科学原因,为从中引出全灌区集中调度的数学模型制定优化决策模式的基本思路与算法打下基础。文中的第三部分论证了渠首工程本身的数学模型,提出了进一步开拓这一工程的几点建议。全文分上中下三篇,构成一个统一整体。这里是它的第一部分。 This paper is the ftrst part of the 'System Analysis of the Dujiangyan Headwork Engineering. Based on the general principles of system science, his- torical experiences and practical data of the Dujiangyan engineering, this paper tries to reveal the scientific principle of the implied 'immortality' of this historical project, and to lay a sound foundation for the basic ideas and calculations for the establishment of the mathematical models of the whole watering rigions and the models for the optimal decision. Part Ⅲ of the paper gives out the argument of the mathematical model of the headwork itself and puts forward some suggestions for the further improvement of the project. Parts Ⅱ and Ⅲ will be issued respectively at the same time in Theory and Practice of System Engineering and System Engineering, No. 3, 1990.
出处 《系统工程学报》 CSCD 1990年第1期90-98,共9页 Journal of Systems Engineering
基金 国家自然科学基金
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部