摘要
本论文为某铸造厂机械加工车间边点所及低压配电系统设计,要求所设计的变电所能长期可靠为其负荷供电。设计过程正确地处理近期建设和远期发展的关系,以近期建设为主,适当兼顾远期建设,运用系统工程的方法从全局出发,正确处理生产与生活、安全与经济等方面的关系,实行资源的综合利用,节约能源和用地,对生产工艺、主要设备和主体工程要做到安全可靠、经济适用、便于施工、先进并为维护管理创造必要的条件。
This paper for a foundry machine shop edge point and low voltage distribution system design, the design of substation can request for its long-term reliable load power supply. Design process properly deal with recent construction and forward development, to the relationship between the recent construction is given priority to, appropriate long-term construction, both by system engineering method from the overall situation, dealing with the production and life, safety and economic aspects of the relationship, the comprehensive utilization of resources, saving energy and land, on production process, the main equipment and the main body of the project to be safe and reliable, economy applicable, facilitating construction, advanced and for the maintenance management to create the necessary conditions.
出处
《科技信息》
2011年第19期I0143-I0143,I0102,共2页
Science & Technology Information
关键词
车间
变电所
低压配电
Worksbop
Substation
Low voltage distribution