期刊文献+

收缩徐变影响的施工期框架结构分析

STRUCTURAL ANALYSIS OF FRAME STRUCTURE UNDER CONSTRUCTIION CONSIDERING EFFECT OF SHRINKAGE AND CREEP
下载PDF
导出
摘要 在施工期间,框架结构中框架柱之间轴压比的不同以及混凝土收缩和徐变的存在,造成了构件之间存在竖向变形差异,进而会对框架结构中梁柱内力产生重要的影响。本文以一栋框架结构高层建筑为分析对象,分析了施工过程及收缩徐变对框架结构竖向变形及内力的影响,并在此基础上对结构分析及设计提出了一些有用的建议。 During the period of construction,shrinkage and creep of concrete and different axial compression ratio result in the difference on vertical deformation between columns of frame structure.And then the difference imposes a great effect on the internal force of beams and columns in frame structure.In the paper,analysis were carried out on the effect of construction procedure and shrinkage and creep of concrete on the vertical deformation and internal force of a high building of frame structure and some conclusion which can acts as useful theory evidence during the structural design and analysis of high building were drawn.
作者 宋灿 郑惠军
出处 《低温建筑技术》 2011年第7期55-57,共3页 Low Temperature Architecture Technology
关键词 框架结构 施工过程 收缩 徐变 竖向变形 内力 frame structure construction procedure shrinkage creep vertical deformation
  • 相关文献

参考文献1

共引文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部