摘要 西气东输二线泾阳泾河穿越是目前我国管径最大的管道长距离定向钻对穿工程,穿越地层主要为卵石层、粉砂层及粉质黏土层。在φ1219大口径钢管穿越设计中采用"大开挖深基坑埋管+长距离夯套管+定向钻对穿"的组合穿越方案,并在施工中实现了优化扩孔器组合、调整泥浆性能、使用推管机协助管道回拖等多种技术创新,成功解决了两岸厚卵砾石层穿越,河床高硬塑性粉质粘土层扩孔时卡钻、抱钻以及管道回拖卡管等施工技术难题,可供类似管径定向钻穿越工程参考。 The Jing River crossing project is the biggest pipe diameter and long-distance directional HDD opposite-direction pipeline crossing engineering in China.The crossed strata mainly contain cobble layer,silt sand layer and silt clay layer.The combination crossing program of 'heavy excavation of deep foundation pit to lay pipe+long-distance raming cannula+HDD opposite-directional crossing' was adopted for φ1219 pipe crossing design.And also,many kinds of innovated construction technologies such as the optimization of reamer's combination,modif ication of the mud property and application of pipe pusher to tow back the pipeline were used in this crossing project.Lots of difficulties were solved successfully in traversing the pebble layer of riverbank,the aiguille blocking or clasping in the highly hard-plastic silty clay layer and the pipe locking in the towback.All of those were useful to similar pipe diameter directional drilling crossing project.
出处 《油气储运》 CAS 北大核心 2011年第7期542-544,471,共3页 Oil & Gas Storage and Transportation
关键词 大口径 天然气长输管道 定向钻对穿 夯套管 基坑埋管 big diameter natural gas pipeline,HDD opposite-direction crossing,tamping bushing,pipe laying in pit
  • 相关文献

参考文献3

二级参考文献13

  • 1何宜章.2005年中国非开挖行业调查[J].非开挖技术,2006(2):1-6. 被引量:2
  • 2闫相祯,丁鹏,杨秀娟,张建,刘锦昆.长距离复杂地层水平定向钻穿越管道施工技术[J].油气储运,2007,26(2):55-58. 被引量:33
  • 3Mohammad N, Sanjiv G.Trenchless technology: pipeline and utility design, construction, and renewalEM].New York: McGraw- Hill Professional, 2004: 247-248.
  • 4Francis M, Kwong J, Kalani J, et aI.Comparison of calculated and observed pipeline pullback forces during horizontal directional drilling[C].NASTT No-Dig, New Orleans, Louisiana, 2004.
  • 5Chin W C.Computational rheology for pipeline and annular flow[M]. Boston: Gulf Professional, 2001: 37-67.
  • 6Duyvestyn G.Comparison of predicted and observed HDD installation loads for various calculation methods[C]. ISTT NoDig, Toronto, Canada, 2009.
  • 7Polak M A, Lasheen A.Mechanical modeling for pipes in horizontal directional drilling[J].Tunnelling and Underground Space Technology, 2002, 16 (Suppl.1) : 47-55.
  • 8Knight M A, Duyvestyn G M, Polak M A.Horizontal directional drilling installation loads on polyethylene pipes[CJ.ISTT No-Dig, Brisbane, Australia, 2006.
  • 9Polak M A.Analysis of polyethylene pipe behavior in horizontal directional drilling field tests[J]. Canadian Journal of Civil Engineering, 2005, 31 : 665-677.
  • 10Ariaratnam S T, Stauber R M, Bell J, et al.Evaluation of rheologic properties of fluids returns from horizontal directional drilIing[C].NASTT/ISTT No-Dig, Arlington, USA, 2003.

共引文献22

同被引文献75

引证文献7

二级引证文献57

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部