摘要
针对宁夏大唐国际大坝发电有限责任公司2×600 MW火电机组设备状况,总结了锅炉灭火后的操作方法,对锅炉灭火后不停机的可行性进行了讨论,并提出了优化建议。
Aiming at the equipment status of 2×600 MW thermal power generation units in Ningxia Datang International Daba Power Generation Co.,Ltd.,sums up the operation method of the boiler fire extinguishing,discusses the feasibility of the boiler fire extinguishing with continuity operation,and puts forward the optimizing suggestion.
出处
《宁夏电力》
2011年第3期48-51,共4页
Ningxia Electric Power
关键词
负荷
水位
压力调整
主燃料跳闸
灭火不停机
load
water level
pressure adjustment
Main Fuel Trip(MFT)
the boiler fire extinguishing with continuity operation