摘要
建设单位在建设新项目时,都会要求设计单位提供若干种设计方案.但是要想从众多设计方案中,选择出一个既经济又实用,且能极大限度地满足建设单位要求的方案是十分困难的.文章通过一个具体实例,先对各个决策因素进行量化,运用模糊决策模型找出一个最符合要求的方案.
Designing department is always required to provide several proposals when constructing new projects.However,it's not easy to satisfy the maximum limit of the designing department,as wall as choosing an economical and practica plan.We set an example on how to find out the best proposal,which is to quantify every policy-meekly factor first,then apply the fuzzy policy sample. We consider the method as useful and valuable in practice.
出处
《太原师范学院学报(自然科学版)》
2011年第2期41-44,104,共5页
Journal of Taiyuan Normal University:Natural Science Edition
关键词
决策
模糊决策
最优决策
建筑设计
数学模型
decision
fuzzy decision
optimal decision
architectural design
mathematical model