摘要
本文提出了一种建立带有约束条件的Delaunay三角网方法,即集成了矿山中的散点数据和线状数据,使模型更接近实际,精度更高,完成建立露天矿的三维模型。本论文以魏家峁露天煤矿为应用实例,对三维可视化系统的部分功能进行了开发,包括现状图数据处理、带有约束条件Delaunay三角网的建立、边界处理以及采场三维模型的建立等功能。该系统是以AutoCAD为开发平台,以面向对象的编程语言ObjectARX对平台进行二次开发。系统在魏家峁露天煤矿得到了较好的应用,表明系统具有实用性强、易于操作、模型可靠等特点。
This thesis has given a arithmetic of Delaunay Triangle network with constrained condition, The method was fit for the Open - pit data composed of points and poly - lines. To complete the establishment of three - dimensional model of open - pit mine, CDT model was high - precision and approached actual open - pit. This thesis takes the Wei- jiabao Surface Mine as an example, to empolder 3D visualization system including data processing of current map, es- tablishing Delaunay triangle network with constrained condition, Border processing and the 3D model of stope and so on. This system is based on AutoCAD to face the program language - - ObjectARX, in order to give a secondary devel- opment. The system has been a good application on the WEIJIAMAO Surface Mine which indicated that the system had the characteristic of practicality, easy operation and stabilizationo
出处
《内蒙古煤炭经济》
2011年第4期37-39,共3页
Inner Mongolia Coal Economy