介绍了大容量汽轮机大修前的准备工作、大修时的标准化工作以及大修后的整理工作,可使技术人员清晰了解汽轮机检修的整个过程,保证在检修过程中做到无缝连接,提高了汽轮机检修质量,节约了检修时间,利于机组长周期安全、稳定运行。
The preparatory work before overhaul,the standardized work during overhaul and the tidying work after overhaul for large-capacity steam turbine were introduced,which can cause the technicians to understand the entire process of steam turbine overhaul clearly.This is helpful to ensure the seamless connection in the overhaul process,to enhance the overhaul quality of the steam turbine and to shorten repairing time;and it is useful for safe and stable operation of the unit in longer period.