摘要
本文从降低费用的角度,分析建设工程施工费用与工期的关系,并以具体实例详细说明工程工期优化的基本思路及其方法。
This article analyzes the relationship between construction project cost and duration from the perspective of reducing costs,and explains the basic ideas and methods to optimize the construction period in detail with specific examples
出处
《价值工程》
2011年第22期66-68,共3页
Value Engineering
关键词
工期优化
费用
直接费
间接费
schedule optimization
costs
direct costs
indirect costs