通过对桥梁工程下部结构桩基施工具体案例的分析,提出了缺陷桩问题的可行性处理方案,以期达到节约工程投资、确保工期、降低工程风险的目的,并为今后同类问题的处理提供参考。
Through analyzing pile foundation construction cases of bridge engineering substructures, the paper proposes feasibility disposal of defective pile problem to reach the goal of saving project investment, ensuring construction period and reducing risk, and provide a reference for future similar problems.
出处
《内蒙古公路与运输》
2011年第3期21-23,共3页
Highways & Transportation in Inner Mongolia
关键词
桩基施工
缺陷桩
变更设计
pile foundation construction
defective pile
altered design